Jump to:       Trophies    Vinyl Decals


Trophies

Start Your Order Here!

the WORK:

There is a great deal of assembly that goes into making each and every Trophy.  Trophies can range from simple designs to very elaborate structures.  Building of a Trophy can require the use of saws, drills, nuts and bolts, and many Trophies include Engraved plates along with other decor or accentuations. 


the ARTWORK:

Trophies come in many different shapes, sizes, colors, and even materials.  Speak with our Trophy building expert to design a custom Trophy specific to your needs.


the PRICING:

Pricing is determined by material and assembly.  Contact us today to build your custom Trophy.

Vinyl Decals

Start Your Order Here!

the WORK:

Vinyl cutting can entail everything from a very simple process, such as cutting out text, or it can entail a very complex process.  Cutting out simple images from a piece of Vinyl is no problem, but cutting out Customer submitted Artwork can take some work.  First we have to upload the image to the Vinyl cutting program; if your image has a complex design or multiple colors, we first have to give it to one of our designers to edit or recreate the image.  Once the image is uploaded, then the program will add what is called a contour line.  This will tell the cutter where it needs to cut the image from the Vinyl.

Now that we have your image cut into the Vinyl, we now have to weed out the excess material.  For simple designs, this is very easy, but for elaborate designs, this process can be very tedious and time consuming.  

the ARTWORK:

Text can be easily designed to include many different styles, fonts, and sizes, but other Artwork can be tricky.  Not all images have distinct edges for which a contour line can be determined.  Our designers can work with you to create or recreate Artwork so that you get exactly what you want.

the PRICING:

Basic Fees:
  • Vinyl Cutting
    • (Height in Inches + Width in Inches)/Divided by 2 = Cost
      • There is a lot of waste associated with Vinyl Cutting and small quantities can lead to a lot of waste.  For larger quantities, we will stick to the typical pricing.  For smaller quantities, we may have to consider the amount of waste associated with the process.
      • Very large orders will be offered discounts
Special Fees
  • Rush Job ($45)
    • Any job that is ordered within 5 days of the due date is considered a rush job